 Before the big wall was finished
 The plant and offices
 The big wall
 Wire tray feeding the logistics offices
 Wires in above wire tray
 Closet B
 Server room without walls
 My breaker panel
 T1 Smart jacks
 T1 Demarc
 A/C Ducts
 Plant from HVI area
 Plant from HVI area 2
 A lot of wire
 Wire to the offices
 Server room side of wire
 T1 cards lit up
 Ceiling being installed, AC duct and some wire
 Not quite a room yet, but a skeleton
 All 288 cables tucked up out of the way
 Building power feed
 Routers for testing
 A baby network
 Static Dissipative Tiles, grounded flooring, one outlet per breaker
 The first network rack is installed
 Clearance behind the network rack
 Clearance to the side of the rack
 The new fire exit...
 Wires tucked into the tray, starting to come together
 Looks like a mess, but it's only going to get worse
 Ladder trays getting filled up
 Halfway terminated!
 Closet C installed
|
|