Before the big wall was finished


The plant and offices


The big wall


Wire tray feeding the logistics offices


Wires in above wire tray


Closet B


Server room without walls


My breaker panel


T1 Smart jacks


T1 Demarc


A/C Ducts


Plant from HVI area


Plant from HVI area 2


A lot of wire


Wire to the offices


Server room side of wire


T1 cards lit up


Ceiling being installed, AC duct and some wire


Not quite a room yet, but a skeleton


All 288 cables tucked up out of the way


Building power feed


Routers for testing


A baby network


Static Dissipative Tiles, grounded flooring, one outlet per breaker


The first network rack is installed


Clearance behind the network rack


Clearance to the side of the rack


The new fire exit...


Wires tucked into the tray, starting to come together


Looks like a mess, but it's only going to get worse


Ladder trays getting filled up


Halfway terminated!